Our Share in Infrastructure Development


Costal Protection


Anti Sea Erosion work in Ennore Expressway at Chennai has been executed for Public Works Department. Granite stones varying from rubble mould sea wall along the sea margin to prevent sea erosion. All the operation had to take place along the expressway with heavy traffic which required extra precaution. The work was carried out using Poclain, Payloaders and cranes.

Railways Gauge Conversion and Track Modernisation

Gauge conversion work of Southern railway between Arakonam and Chengalpattu for a distance of about 8 Kms was carried out job requiring controlled blasting, design mix concrete and earth work involving heavy machinery.

Road Works 

Three kilometer length of formation of Chennai By Pass Road from Tambaram to Minjur for national Highway authorities is carried out by formation of earthern bund satisfying the Most standards especially in circumstances where quality earth for the bund formation is not available in a short distance.

Culverts and Bridges

The gauge conversion work between Arakonam and Chengalpattu involved construction of bridges and culverts. One of the existing minor bridges in the zone was bodily lifted using an innovative technique with our cranes and machineries and reset in the required place and level. This whole work was appreciated by all the railway officials.